News in English     | 09.02.2021. 17:03 |

AFBiH members complete engineering works in the Lipa migrant camp

FENA Press release

SARAJEVO, February 9 (FENA) - In accordance with the Decision of the Presidency of Bosnia and Herzegovina, members of the Engineering Battalion of the Tactical Support Brigade of the Armed Forces of Bosnia and Herzegovina (AFBiH) today completed engineering works to establish a container settlement for migrants in the Lipa camp near Bihać.

The works on the construction of the access road for the installation of a container settlement in the Lipa camp, the works on wastewater and rainwater drainage, the plateau in front of the camp have all been completed, said the Ministry of Defense of BiH.

The works lasted from February 3 to 9, 2021. Representatives of the local community expressed gratitude for the assistance provided, and after the handover of the works, the AF unit will tomorrow return to its home location in the area of deployment in Derventa.

(FENA) S. R.

Vezane vijesti


Warning: Invalid argument supplied for foreach() in /var/www/vhosts/fena.ba/httpdocs/post-new.php on line 379

Promo

M:tel: Nastavak akcije 'Niste sami, imate prijatelje'

M:tel ljetna akademija za studente IKT usmjerenja: Prijavi se na praksu u kolovozu

M:tel: Aktivirajte m:tel uslugu i uzmite 5 GB mobilnog interneta